Design and construction work to expand production capacity and laying pipes to expand the area for supplying industrial water Chaimongkol Waterworks
- UF/RO water supply system work, phase 1, size 4,000 cubic meters per day.
- UF/RO water supply system work, phase 2, size 4,000 cubic meters per day.
- Construction of a 2,000 cubic meter clear water tank.
- Pipe laying for area expansion, HDPE pipe laying, size 400 mm., distance approximately 3,300 m. and Size 315 mm., approx. 4,300 m. and 225 mm., approx. 5000 m.