Solar power plant installed on the roof, size 431.20 kW
Project Owner : Super Water Company Limited
Location : Kathu District, Phuket Province
Hand Over Work : November 2020
Details : - Work station for water supply system, Mobile Pre Fab, size 300 m3/hr.
- Pipe laying for area expansion, HDPE pipe laying, size 315 mm., distance of about 200 m. and HDPE pipe laying, size 225 mm., distance approximately 3,500 m.