Construction of a water supply station in Kathu Subdistrict The total production capacity is 300 cubic meters per hour. and laying water pipes
Project Owner : Super Solar Energy Company Limited
Installation : 274.50 kW
Location : Si Thep District, Phetchabun
COD : March 2020
Details : Design, construction and installation of solar power generation systems