Loc Ninh-Binh Long 2_220KV Transmission Line and Substation
Project Owner : Super Solar Energy Company Limited
Installation : 274.50 kW
Location : Si Thep District, Phetchabun
COD : March 2020
Details : Design, construction and installation of solar power generation systems