Construction of a water supply station in Kathu Subdistrict The total production capacity is 300 cubic meters per hour. and laying water pipes
Project Owner : Super Solar Energy Company Limited
Installation : 100.00 kW
Location : Bang Pakong District, Chachoengsao Province
COD : November 2020
Details : Design, construction and installation of solar power generation systems